Solid Unlacquered Brass Eight Inch Round Rain Shower Head with S-Curve Wall Arm
- Regular price
- £127.00 GBP
- Sale price
- £127.00 GBP
- Regular price
-
Made for a bathroom that is used every day, with the weight and the patina of a fixture meant to stay.
A small round wall flange carries a short shower arm that comes straight out of the wall and curves down. At its end a small nut and a ball joint hold a flat eight inch rain head, a thin disc with a plain rim and a face of evenly spaced nozzles.
Left unlacquered, the brass is alive. It starts warm and golden, then darkens where hands and water reach it, keeping its light where they do not. Within a few months it settles into a deep amber with darker tones in every recess, a finish no coating can imitate. If you prefer it bright again, a soft cloth and a little brass polish bring it back in minutes.
Cast, turned and finished by hand in solid brass. No plating, no lacquer, no shortcuts.
Specifications
- Material: Solid unlacquered brass
- Finish: Living unlacquered, develops a natural patina over time
- Type: Unlacquered Brass Rain Shower Head with Wall Arm
- Dimensions: Rain head 7.9", Arm reach 5.5", Arm drop 3.9"
- Handmade: Yes
- Customization available: Yes
Every Maison Marlow fixture is certified for use in the United States and Canada.
- cUPC listed by IAPMO R&T, the certification mark required under the Uniform Plumbing Code for faucets, valves and shower fittings.
- NSF/ANSI 61 certified for components in contact with drinking water.
- NSF/ANSI 372 certified lead-free.
Listing numbers and certification documents are available on request for trade and specification projects.
Trade & specification inquiriesSolid unlacquered brass has a soul. With no sealant to hide behind, it breathes with your home, deepening over time into a warm patina that is yours alone. No two ever age the same way.
- If you love the patina: do nothing. Let it live. A dry cloth after use keeps the tone even as it darkens.
- If you prefer the shine: a minute with brass polish, or lemon and baking soda, brings back the bright gold. Always reversible.
- What to skip: bleach, vinegar, and abrasive pads. They patina the metal unevenly.
Want this piece in a different finish? Just reach out and we will make it for you.
Free shipping to the United States, the United Kingdom, Canada and Australia, on every order. Orders leave within 2 to 4 business days and arrive 6 to 8 business days later, tracked.
60 days to change your mind. If the piece is not right, contact us within 60 days of delivery and we send you a prepaid return label. Return shipping is on us and there is no restocking fee. The item must come back unused, uninstalled and in its original packaging.
If your order arrives damaged, never arrives, or is not what you ordered, contact us immediately and we make it right at our cost.
5-year warranty. Every piece is covered against manufacturing defects for 5 years from delivery, parts replaced free of charge, shipping included. See our 5-year warranty page.
Read our Return PolicyFrequently Bought Together
Frequently Asked Questions
Will the unlacquered finish tarnish over time?
Yes and that's exactly the point. We leave our brass and copper bare so they develop a living patina, deepening and warming with everyday use. It isn't damage or a defect; it's the finish maturing into something richer.
Are these really handmade?
Yes, genuinely. Each piece is cast, shaped and hand-finished in small batches, not stamped out on an assembly line. Because a person finishes every one, no two are exactly alike, small variations in the surface and patina are the mark of a piece made by hand, not a flaw.
Are your pieces solid metal, or plated?
Solid, all the way through, solid brass and solid copper, never a thin plating over zinc. That's why our pieces can be polished, refinished and passed down rather than replaced. The metal you see on the surface is the metal throughout.
Do you work with designers and trade projects?
We do. Trade pricing, spec sheets and volume lead times are available on account. See our Trade program.
How long will my order take?
Orders leave our warehouse within 2 to 4 business days and arrive 6 to 8 business days later, tracked. Shipping is free to the United States, the United Kingdom, Canada and Australia, and you get a tracking number by email as soon as your order ships.
Customer Support
Monday to Friday, 9:00 AM to 5:00 PM Mountain Time. We reply within 1 business day.
60-Day Returns
Take 60 days to live with it. If it is not right, we pay the return shipping and refund you in full.
Free Shipping
Free on every order to the United States, the United Kingdom, Canada and Australia. Nothing is added at checkout.

